Skip to product information
1 of 1

2021 International Existing Building Code (International Code Council Series) 1st Edition

2021 International Existing Building Code (International Code Council Series) 1st Edition

12 people are viewing this product right now
Regular price Rs.24,400.00
Regular price Sale price Rs.24,400.00
Sale Sold out
Shipping calculated at checkout.
Quantity

Exclusive Offers Just for You!

Save 12% on orders of $49+

Use Code:  EXTRA12

Save 15% on orders of $499+

Use Code:  EXTRA20

Enjoy Free Shipping on all orders!

Code copied!

Product Details

  • Condition: New
  • Language: English
  • SHIP FROM USA
  • FREE SHIPPING

Encourages the use and reuse of existing buildings. This code covers repair, alteration, addition and change of occupancy for existing buildings. and historic buildings, while achieving appropriate levels of safety without requiring full compliance with the new construction requirements contained in the other I-Codes. Key changes in the 2021 IEBC include: For storm shelters, the required occupant capacity is now limited to the total occupant load of the classrooms, vocational rooms and offices in the school while the maximum distance of travel was deleted. When significant portions of a building’s exterior wall coverings or exterior wall envelope are added or replaced, they must comply with the requirements of Chapters 14 and 26 of the IBC. Snow loads must be addressed during repair of substantial structural damage regardless of whether the damage was a result of snow. Additions, Level 3 alterations and Changes of occupancy in Educational occupancies are now required to meet the enhanced classroom acoustic requirements of Section 808 of ICC A117.1. Additional equipment may be added to a roof without a full structural analysis when the equipment weighs less than 400 pounds and is less than 10 percent of the total roof dead load. With a change of occupancy, a seismic analysis is required for a Group S or Group U occupancy changing to a new occupancy. Furniture, such as office cubicles, reception desks or smaller bookcases, are exempt from a permit and not intended to be a Level 2 alteration. Sprinkler requirements for Level 2 and Level 3 alterations are revised for higher hazard areas.

Shipping, Return & Exchange

Shipping & Delivery:-

Normal Delivery: Estimated delivery time is 5 to 7 business days from the date of shipment.

Express Delivery: Estimated delivery time is 3 to 5 business days from the date of shipment.

Returns & Exchange: Please refer to our Return and Exchange Policy for more details.

View full details